First mirror stability at the MAX IV soft x-ray beamlines
Pickworth, L. A.; Sankari, R.; Sondhauss, P.; Lebugle, M.; Tokushima, T.; Agåker, M.; Preobrajenski, A.; Polley, C.; Leandersson, M.; Thiagarajan, B.; Chernenko, K.; Thånell, K.; Mårsell, E.; Schwenke, J.; Beinik, I.; Shavorskiy, A.; Yaroslavtsev, A.; Adell, J.; Ryll, H.; Henninger, H.; Cerenius, Y. (2025)
Pickworth, L. A.
Sankari, R.
Sondhauss, P.
Lebugle, M.
Tokushima, T.
Agåker, M.
Preobrajenski, A.
Polley, C.
Leandersson, M.
Thiagarajan, B.
Chernenko, K.
Thånell, K.
Mårsell, E.
Schwenke, J.
Beinik, I.
Shavorskiy, A.
Yaroslavtsev, A.
Adell, J.
Ryll, H.
Henninger, H.
Cerenius, Y.
2025
Julkaisun pysyvä osoite on
https://urn.fi/URN:NBN:fi:tuni-202508118176
https://urn.fi/URN:NBN:fi:tuni-202508118176
Kuvaus
Peer reviewed
Tiivistelmä
Horizontal drift of the beam on the MAX IV soft x-ray beamlines was observed with a 1-2 hour settling time and strong dependence on the undulator power setting. A water cooled, suspended electrode was designed and is shown to reduce the horizontal beam drift on three MAX IV soft x-ray beamlines to acceptable operational levels.
Kokoelmat
- TUNICRIS-julkaisut [22172]
