Hyppää sisältöön
    • Suomeksi
    • In English
Trepo
  • Suomeksi
  • In English
  • Kirjaudu
Näytä viite 
  •   Etusivu
  • Trepo
  • TUNICRIS-julkaisut
  • Näytä viite
  •   Etusivu
  • Trepo
  • TUNICRIS-julkaisut
  • Näytä viite
JavaScript is disabled for your browser. Some features of this site may not work without it.

The dynamics of repairing multi-project control practice: a project governance viewpoint

Laine, Teemu; Korhonen, Tuomas; Suomala, Petri (2020)

 
Avaa tiedosto
Laine_et_al_2020_IJPM_Pre_print_OA.pdf (41.31Kt)
The_dynamics_of_repairing_multi_project_2020.pdf (1.032Mt)
Lataukset: 



Laine, Teemu
Korhonen, Tuomas
Suomala, Petri
2020

International Journal of Project Management
This publication is copyrighted. You may download, display and print it for Your own personal use. Commercial use is prohibited.
cc by-nc-nd 4.0
doi:10.1016/j.ijproman.2020.06.010
Näytä kaikki kuvailutiedot
Julkaisun pysyvä osoite on
https://urn.fi/URN:NBN:fi:tuni-202011057823

Kuvaus

Peer reviewed
Tiivistelmä
This paper examines the development of enabling control practice, within flexible project governance. Enabling control would interactively help reach the objectives set for multi-project new product development (NPD) management and, especially support the different managerial actors involved. Previous research does not adequately cover the dynamics and interplay between different managerial actors in developing management control for multi-project NPD. This paper responds to the question: How can actors interactively repair multi-project control practice within project governance? The paper takes advantage of a longitudinal action research endeavor (2009-2014), featuring research interventions on developing project control in subsequent NPD projects. The researchers collected empirical data from 130 documented project meetings, workshops, and interactions, and the data were qualitatively analyzed to identify critical steps in multi-project control practice repair. First, as a contribution to the project management literature, we show how the repair effort, as organizational interplay, may effectively, and temporarily or permanently repair inoperative NPD control practice in subsequent projects. Second, we contribute to the literature on enabling control by showing how repairing multi-project control system can be a starting point for centralized control repair, requiring commitment from different management levels. Third, by bridging the two research areas, we identify possibilities for further research.
Kokoelmat
  • TUNICRIS-julkaisut [20161]
Kalevantie 5
PL 617
33014 Tampereen yliopisto
oa[@]tuni.fi | Tietosuoja | Saavutettavuusseloste
 

 

Selaa kokoelmaa

TekijätNimekkeetTiedekunta (2019 -)Tiedekunta (- 2018)Tutkinto-ohjelmat ja opintosuunnatAvainsanatJulkaisuajatKokoelmat

Omat tiedot

Kirjaudu sisäänRekisteröidy
Kalevantie 5
PL 617
33014 Tampereen yliopisto
oa[@]tuni.fi | Tietosuoja | Saavutettavuusseloste