High Nitrogen Removal in a Constructed Wetland Receiving Treated Wastewater in a Cold Climate

Uusheimo, Sari; Huotari, Jussi; Tulonen, Tiina; Aalto, Sanni L.; Rissanen, Antti J.; Arvola, Lauri (2018-11-20)

 
Avaa tiedosto
high_nitrogen_removal_in_a_constructed_2018.pdf (4.150Mt)
Lataukset: 



Uusheimo, Sari
Huotari, Jussi
Tulonen, Tiina
Aalto, Sanni L.
Rissanen, Antti J.
Arvola, Lauri
20.11.2018

Environmental science & technology
This publication is copyrighted. You may download, display and print it for Your own personal use. Commercial use is prohibited.
doi:10.1021/acs.est.8b03032
Näytä kaikki kuvailutiedot
Julkaisun pysyvä osoite on
https://urn.fi/URN:NBN:fi:tuni-201910234051

Kuvaus

Peer reviewed
Tiivistelmä
<p>Constructed wetlands provide cost-efficient nutrient removal, with minimal input of human labor and energy, and their number is globally increasing. However, in northern latitudes, wetlands are rarely utilized, because their nutrient removal efficiency has been questioned due to the cold climate. Here, we studied nutrient retention and nitrogen removal in a boreal constructed wetland (4-ha) receiving treated nitrogen-rich wastewater. On a yearly basis, most of the inorganic nutrients were retained by the wetland. The highest retention efficiency was found during the ice-free period, being 79% for ammonium-nitrogen (NH4+-N), 71% for nitrate-nitrogen (NO3--N), and 88% for phosphate-phosphorus (PO43--P). Wetland also acted as a buffer zone during the disturbed nitrification process of the wastewater treatment plant. Denitrification varied between 106 and 252 mg N m-2 d-1 during the ice-free period. During the ice-cover period, total gaseous nitrogen removal was 147 mg N m-2 d-1, from which 66% was removed as N2, 28.5% as N2O through denitrification, and 5.5% as N2 through anammox. Nearly 2600 kg N y-1 was estimated to be removed through microbial gaseous N-production which equaled 72% of NO3--N and 60% of TN yearly retention in the wetland. The wetland retained nutrients even in winter, when good oxygen conditions prevailed under ice. The results suggest that constructed wetlands are an efficient option for wastewater nitrogen removal and nutrient retention also in cold climates.</p>
Kokoelmat
  • TUNICRIS-julkaisut [23422]
Kalevantie 5
PL 617
33014 Tampereen yliopisto
oa[@]tuni.fi | Tietosuoja | Saavutettavuusseloste
 

 

Selaa kokoelmaa

TekijätNimekkeetTiedekunta (2019 -)Tiedekunta (- 2018)Tutkinto-ohjelmat ja opintosuunnatAvainsanatJulkaisuajatKokoelmat

Omat tiedot

Kirjaudu sisäänRekisteröidy
Kalevantie 5
PL 617
33014 Tampereen yliopisto
oa[@]tuni.fi | Tietosuoja | Saavutettavuusseloste