Post-fault Activation of Flexible Resources to Manage Regional Congestions Caused by a Contingency during a Planned Outage
Peltoketo, Suvi; Kuusela, Antti; Nikkilä, Antti-Juhani; Repo, Sami (2023)
Avaa tiedosto
Lataukset:
Peltoketo, Suvi
Kuusela, Antti
Nikkilä, Antti-Juhani
Repo, Sami
IEEE
2023
2023 19th International Conference on the European Energy Market, EEM 2023
This publication is copyrighted. You may download, display and print it for Your own personal use. Commercial use is prohibited
Julkaisun pysyvä osoite on
https://urn.fi/URN:NBN:fi:tuni-202401101295
https://urn.fi/URN:NBN:fi:tuni-202401101295
Kuvaus
Peer reviewed
Tiivistelmä
This paper focuses on regional and local outage planning of an electricity transmission system and presents a novel outage planning approach to solve grid congestions caused by a contingency during a planned outage in significantly surplus regions. The novel approach utilizes temporary admissible transmission loading as an enabler of a post-fault activation of flexible resources and minimizes the need to restrict the active power input into the transmission grid during a planned outage while still complying with the operational security limits. The paper presents suitable redispatching methods to implement the proposed approach, discusses its advantages and risks from three perspectives and compares it with the conventional approach. The proposed approach is expected to be more beneficial for the connected parties and the society, however, it may increase the risks and costs of a TSO compared with the conventional approach.
Kokoelmat
- TUNICRIS-julkaisut [19830]